Abbas, N M A (2007) Construction claims in Saudi Arabia: a study of sources and associations of claims, Unpublished PhD Thesis, Department of Civil Engineering, University of Strathclyde.

  • Type: Thesis
  • Keywords: conflict; consultant; contract administration; government; life expectancy; NEC; owner; ownership; participation; payment; Saudi Arabia; skills
  • ISBN/ISSN:
  • URL: http://oleg.lib.strath.ac.uk:80/R/?func=dbin-jump-full&object_id=21968
  • Abstract:
    The construction industry is a complex one involving the participation of several parties, each with its own aims from getting into a project. The difference in these aims is one basic factor leading to conflicts and claims. Ownership of projects is split between government (public) and private entities and the size of projects in terms of cost could be categorized between small, medium and large. The Saudi construction industry is relatively young, and research on the local environment and problems is far from being extensive. This thesis will discuss the issue of construction claims in the Saudi construction industry with the aim of identifying the major heads of claims in the country. A literature review was made and the dependent and independent variables affecting the claim issue were identified. The dependent variables were Time, Money, Quality, Operation, Function, Life Expectancy, Reputation and Future Relations. The independent variables were: Party to a project (owner, contractor and consultant) Project Ownership (government, private) and Size of a project (small, medium or large). From the literature review and from experience the claim causes were grouped under six claim groups: 'Acts of God', 'Man-made', 'Market-Driven', 'Site Conditions', 'Contract Administration-based' and 'Information-based' claims. A research methodology was formulated to gather the necessary data by a postal questionnaire. Responses were classified in three major categories; party to the project responding to the questionnaire (owner, contractor or consultant) ownership of the project (government or private) and size of the project (small, medium or large). Six hypotheses were formulated and the data was analysed to get results and test the hypotheses. The results were discussed and they showed that the Information-based group of claims had the strongest association with the sample followed by the 'Contract Administration' group. The highest weight of association of claims in the 'Information-based' group were by the claims on poor skills by contractor, defected work by contractor and poor management by contractor. In this group the Money factor was the most highly associated followed by the Time factor. The highest weight of association of claims in the 'Contract Administration' group were by the claims on delayed payments by owner, variation order timing and the claim on too many variation orders. In this group, the Time factor was the most highest associated of the eight variables followed by the Money factor. This research on Saudi Arabia identifies the source of claims based on the perception of a hundred respondents to the questionnaire. A summary of the findings was made together with what contribution this thesis has made to new knowledge. A section on future work was also included.

Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England, Unpublished PhD Thesis, Law School, University of Strathclyde.

Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects, Unpublished PhD Thesis, , University of Strathclyde.

Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness, Unpublished PhD Thesis, , University of Strathclyde.

Alahmadi, N H (2018) Nudging contracting firms rivals within municipal road projects in Saudi Arabia to bid competitively, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Bell, T (2018) A detailed investigation into the engineering properties and challenges affecting the potential introduction of a UK grown dowel-laminated timber floor panel into the domestic construction market, Unpublished PhD Thesis, Department of Architecture, University of Strathclyde.

Branki, C N E (1995) Agents, applications, and interactions in collaborative building design, Unpublished PhD Thesis, , University of Strathclyde.

Campos, C R (2023) Simplified Matlab calculation tool for LCA optimization of domestic buildings, Unpublished PhD Thesis, , University of Strathclyde.

Charley, J (1995) The dialectic of the built environment: A study in the historical transformation of labour and space, Unpublished PhD Thesis, , University of Strathclyde.

Coffey, M (1995) The propensity for participation in mechanical and electrical sub-contractors in the British construction industry, Unpublished PhD Thesis, , University of Strathclyde.

Collins, H J (2007) Identity and interpretation of the built environment: a case study of interpretation of symbolic artefacts in the organisational built environment and it's effect on the identity forming process, Unpublished PhD Thesis, , University of Strathclyde.

Craigen, A (1990) Britain's school building estate: evaluation by life cycle for effective maintenance, with an illustrated study on Glasgow schools, Unpublished PhD Thesis, , University of Strathclyde.

Cummings, A J G (1980) The York Buildings Company: A case study in eighteenth century corporation mismanagement, Unpublished PhD Thesis, , University of Strathclyde.

Duncheva, T A (2019) Offsite timber systems multi-factor productivity index, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Hajjah Dayang Suzana, B H A A (2006) An exploration of the business environment of the construction industry of Negara Brunei Darussalam: in the context of public-private partnerships, privatisation and private finance initiatives, Unpublished PhD Thesis, Department of Architecture and Building Science , University of Strathclyde.

Hand, J W (1998) Removing barriers to the use of simulation in the building design professions, Unpublished PhD Thesis, , University of Strathclyde.

Hassanien, A (2003) Analysing hotel repositioning through property renovation in the hospitality industry, Unpublished PhD Thesis, The Scottish Hotel School , University of Strathclyde.

Hughes, J (2020) Global claims in engineering and construction contracts, Unpublished PhD Thesis, Law School , University of Strathclyde.

Ibrahim, W A B (2016) Regulatory framework for adjudicators in the Malaysian construction industry, Unpublished PhD Thesis, Law School , University of Strathclyde.

Makulsawatudom, A (2003) Construction productivity measurement and improvement in Thailand by improved work-sampling, Unpublished PhD Thesis, Department of Architecture and Building Science, University of Strathclyde.

Mansfield, N R (1990) The internationalisation of the British construction consulting sector and technology transfer in developing countries, Unpublished PhD Thesis, Department of Marketing , University of Strathclyde.

McElroy, L B (2009) Embedding integrated building performance assessment in design practice, Unpublished PhD Thesis, Department of Architecture and Building Science , University of Strathclyde.

McLellan, R (1994) The use of project management procedures by construction contractors, Unpublished PhD Thesis, Department of Civil Engineering , University of Strathclyde.

Mohd Nor, M F I (2019) The development of a pedagogical framework for the integration of building information modelling in the architecture degree programme in Malaysia, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Morbitzer, C A (2003) Towards the integration of simulation into the building design process, Unpublished PhD Thesis, , University of Strathclyde.

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation, Unpublished PhD Thesis, , University of Strathclyde.

Newton, S (1983) Analysis of construction economics: a cost simulation model, Unpublished PhD Thesis, Department of Architecture and Building Science , University of Strathclyde.

Orsaah, S (1984) Perception and management of risk in the construction industry, Unpublished PhD Thesis, Department of Marketing , University of Strathclyde.

Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions, Unpublished PhD Thesis, Department of Architecture and Building Science, University of Strathclyde.

Sinha, S (2006) Skill based framework for measuring complexity of construction projects, Unpublished PhD Thesis, , University of Strathclyde.

Tennant, S (2007) Site management teams and project performance in the UK construction industry, Unpublished PhD Thesis, Department of Architecture , University of Strathclyde.

Verzobio, A (2020) Supporting rational decision-making in civil engineering, Unpublished PhD Thesis, , University of Strathclyde.

Walters, R J (1983) An evaluation of user experience of CAAD: With particular reference to health buildings, Unpublished PhD Thesis, , University of Strathclyde.

Wools, R M (1971) The subjective appraisal of buildings, Unpublished PhD Thesis, , University of Strathclyde.

Yakubu, S U-N (2017) The barriers to the implementation and enforcement of the Building Code Standards Structural Provisions for mid-rise residential buildings: the case of Nigeria, Unpublished PhD Thesis, , University of Strathclyde.

Zhang, L (2022) Risk management framework to guide off-site manufacturing process: a Chinese perspective, Unpublished PhD Thesis, , University of Strathclyde.

Zubairu, M (1990) Sites and services housing development: Strategies for improving the effective demand for projects by low-income families in the urban areas of Nigeria, Unpublished PhD Thesis, , University of Strathclyde.